V2G procurement for fleets and utilities in 2026 means buying a bidirectional DC charger speaking ISO 15118-20, CHAdeMO or OCPP 2.1 V2X, paired with a utility interconnection (UK G99, California Rule 21, Germany VDE-AR-N 4105) and an aggregator revenue stack. A 50 kW CCS bidirectional unit lists at USD 5,000–15,000; verified fleet pilots report USD 1,000–5,000 per vehicle per year, rising above USD 10,000 for school buses with summer idle. HG Power manufactures 30–720 kW DC fast chargers and AC wallboxes with CE, TUV CB, UKCA, Australia RCM, ETL and ENERGY STAR certifications for regional distributors, fleet integrators and OEM buyers in developed markets, including the HG Power V2G Bidirectional Series from 15 to 240 kW.

1. What V2G procurement actually buys you

Vehicle-to-grid (V2G) procurement delivers four things in one tender: a bidirectional DC charger (typically 15–60 kW per port for depot use, 100–240 kW for utility-scale installations), a communication stack that supports ISO 15118-20 or CHAdeMO bidirectional profiles, a utility interconnection certificate (G99 in the UK, Rule 21 interconnection agreement in California, VDE-AR-N 4105 in Germany), and an aggregation contract that monetises frequency regulation, peak shaving or demand response. Residential V2G (Wallbox Quasar, Zaptec Pro V2G) is a different product class; fleet and utility buyers should treat it as adjacent benchmark data, not a direct substitute.

2. V2G vs V2H vs V2L: scope the project correctly

The three bidirectional modes solve different problems and use different hardware. Mis-scoping is the single most common procurement error we see in fleet RFQs.

Mode Power flow Typical power Interface Primary use case
V2L (vehicle-to-load) EV → appliance 1.5–3.6 kW AC Onboard AC socket (Hyundai Ioniq 5, Kia EV6, Ford F-150 Lightning) Jobsite tools, camping, emergency appliances
V2H (vehicle-to-home) EV ↔ home panel 7.4–11 kW DC/AC Bidirectional wallbox + home transfer switch Backup power during outage, self-consumption
V2G (vehicle-to-grid) EV ↔ utility grid 11–240 kW DC Bidirectional DC charger + utility interconnection + aggregator Frequency regulation, peak shaving, demand response, capacity markets

V2G is the only mode that generates grid revenue. V2H reduces the home electricity bill. V2L is a convenience feature. Fleet depots almost always want V2G; residential buyers almost always want V2H.

3. The bidirectional protocol stack: ISO 15118-20, CHAdeMO, OCPP 2.1 V2X

Three protocols matter for 2026 procurement. ISO 15118-20:2022 is the forward-looking standard: it adds bidirectional power transfer over both CCS2 and (optionally) CHAdeMO, mutual TLS 1.3 authentication, WLAN high-level communication, and multi-contract Plug & Charge. CHAdeMO has been natively bidirectional since 2012 (its origin was Japan’s post-Fukushima grid resilience programme) and remains the dominant bidirectional protocol on Nissan Leaf, Mitsubishi Outlander PHEV and Japanese market vehicles. OCPP 2.1 introduces V2X extensions in the charger-to-backend layer, letting the aggregator schedule bidirectional sessions, cap discharge depth and settle energy transactions.

Protocol Bidirectional status Vehicle support Typical use
ISO 15118-20:2022 Native bidirectional (CCS2 and CHAdeMO profiles) Kia EV9, Hyundai Ioniq 5/6 (model-year dependent), Volvo EX90 roadmap, VW ID family roadmap EU AFIR-compliant V2G, Plug & Charge contract settlement
CHAdeMO 2.0 / 3.0 (ChaoJi) Native bidirectional since 2012 Nissan Leaf, Mitsubishi Outlander PHEV, Japanese fleet vehicles Japan grid support, legacy V2G pilots, dual-standard depots
ISO 15118-2:2014 Unidirectional only (TLS 1.2) Most CCS vehicles 2018–2024 Plug & Charge for unidirectional sessions; not sufficient for V2G alone
OCPP 2.1 (V2X extensions) Charger ↔ backend scheduling N/A (charger-side) Aggregator dispatch, discharge limits, energy settlement

Practical procurement rule: specify ISO 15118-20 and OCPP 2.1 as mandatory, and require CHAdeMO bidirectional as a configurable option if your fleet includes Nissan or Mitsubishi models or you need Japan-market compatibility. The Numbat charger is currently the only commercial unit that natively supports CHAdeMO and CCS2 in the same cabinet; Watt&Well has published tested bidirectional operation on the Kia EV9 and Nissan Leaf.

4. Fleet-type recommendation matrix

The right V2G configuration depends on fleet duty cycle, dwell time at the depot, and the local revenue stack. The matrix below is calibrated to European and North American markets as of October 2026.

Fleet type Dwell at depot Recommended power per port Protocol priority Primary revenue stream
Urban transit bus Overnight 6–10 h 60–150 kW DC bidirectional ISO 15118-20 + OCPP 2.1 V2X Peak shaving, demand response, capacity market
School bus Overnight + summer idle 60–80 days 60–100 kW DC bidirectional CHAdeMO (legacy fleets) or ISO 15118-20 (new) Frequency regulation + summer capacity (highest ROI per vehicle)
Logistics / last-mile LCV Overnight 8–12 h 30–60 kW DC bidirectional ISO 15118-20 + OCPP 2.1 V2X Peak shaving, time-of-use arbitrage
Utility service fleet Overnight + daytime partial 15–60 kW DC bidirectional ISO 15118-20 (fleet-owned CA) Internal peak shaving at substation, outage backup
Taxi / ride-hail depot Variable 2–8 h, high turnover 60–150 kW DC bidirectional ISO 15118-20 + OCPP 2.1 Opportunistic frequency regulation only
Car-sharing / airport rental Variable, long idle windows 30–100 kW DC bidirectional ISO 15118-20 Peak shaving, demand response

5. Economic model: ROI by use case

Public pilots and aggregator disclosures from 2023–2026 give a defensible range. Fleet grid revenue is a function of three variables: available plug-in hours per year, local ancillary-service price, and discharge throughput allowed by the OEM warranty. The ranges below are the per-vehicle gross revenue reported in verified pilots, before the depot’s share of aggregator fees.

Use case Gross revenue per vehicle per year Driver Source class
Light-duty fleet, frequency regulation USD 1,000–3,000 FCR / FCAS prices in EU and ERCOT markets Aggregator case studies, LA AFB pilot
Light-duty fleet, peak shaving + DR USD 2,000–5,000 Utility DR programme payments + demand-charge avoidance NYC pilot, UK fleet guides
School bus (summer idle) USD 10,000+ 60–80 days of near-100% plug-in during summer Efficiency Maine, NY school bus pilots
Urban transit bus USD 3,000–8,000 Large battery (300–600 kWh) × overnight dispatch EU city-bus trials
Residential V2H (reference only) GBP 400–900 bill savings Self-consumption of PV + ToU arbitrage UK Switch Pilot, Octopus

Capital cost benchmarks: a 50 kW CCS bidirectional DC charger lists at USD 5,000–15,000, roughly 1.5–2× the price of a unidirectional 50 kW DC unit. UK installed cost for a residential-grade V2G charger is GBP 4,000–7,000 versus GBP 800–1,200 for a standard smart AC wallbox. Utility service upgrades for a five-EV depot typically run USD 8,000–10,000 on top of the charger itself. For most depot fleets the payback window is 3–5 years; for school buses with summer idle it compresses to 12–24 months.

6. Grid interconnection: G99, Rule 21, VDE-AR-N 4105

You cannot export energy to the grid without the local DNO or utility signing off on the interconnection. The three regimes buyers encounter most often:

UK — G99
Engineering Recommendation G99 (Issue 1 Amendment 10, 2024) governs connection of generation above 16 A per phase. V2G chargers above 3.68 kW typically fall under G99 and require pre-connection DNO approval; smaller units fall under G98. Expect 4–8 weeks for a Type Tested Form A1-1 approval.
California — Rule 21
CPUC Rule 21 governs interconnection of distributed energy resources including V2G. UL 1741 SB and IEEE 1547-2018 compliance is required; the inverter inside the bidirectional charger must be on the CEC-approved list.
Germany / EU — VDE-AR-N 4105
VDE-AR-N 4105:2018-11 governs low-voltage grid connection of generators up to 135 kW. V2G chargers above 11 kW are notifiable; above 30 kW require Netzbetreiber approval. VDE-AR-N 4110 covers medium-voltage connections for larger depot aggregations.
EU — AFIR context
The Alternative Fuels Infrastructure Regulation (Regulation (EU) 2023/1804) does not mandate V2G, but its ISO 15118 deadlines (2026-01-08 for new public AC, 2027-01-01 for ISO 15118-20) make bidirectional-ready hardware the default spec for new procurement.

7. Hardware shortlist: commercial bidirectional chargers in 2026

The commercial V2G hardware market is still narrow. These are the products with verifiable bidirectional operation and fleet-grade references as of October 2026.

Product Power Connector Standard Notes
Wallbox Quasar v1 / v2 7.4 kW CHAdeMO (v1), CCS2 (v2) CHAdeMO BiDi, ISO 15118-20 (v2) Residential / light fleet; UK G99 approved
Zaptec Pro V2G 22 kW AC bidirectional Type 2 ISO 15118-20 roadmap European residential and small commercial
Numbat 30 kW CHAdeMO + CCS2 (dual) CHAdeMO BiDi, ISO 15118-20 Only widely referenced unit with both bidirectional protocols in one cabinet
Watt&Well bidirectional Up to 25 kW CCS2 / CHAdeMO ISO 15118-20 Tested on Kia EV9 and Nissan Leaf; power-electronics specialist
HG Power V2G Bidirectional Series 15–240 kW CCS2, CHAdeMO configurable ISO 15118-20 target, OCPP 2.0.1J / 2.1 Fleet / depot / utility focused; CE, TUV CB, UKCA, RCM, ETL on sibling product lines

8. HG Power V2G Bidirectional Series: 15–240 kW

The HG Power V2G Bidirectional Series spans 15 kW (depot overnight) to 240 kW (utility-scale and transit-bus applications). It is designed for fleet integrators and utility DER programmes and sits inside the same 9-series HG Power product family as the Galaxy AC, Stellar AC/DC, Genesis DC Integrated, Aurora Split and Deepsea / Glacier liquid-cooled platforms.

Attribute HG Power V2G Bidirectional Series
Power range 15 / 30 / 60 / 120 / 180 / 240 kW (configurable per order)
Connector options CCS2, CHAdeMO, Type 2 (depot AC pairing)
Bidirectional protocol CHAdeMO BiDi; ISO 15118-20 roadmap (configurable per order)
OCPP OCPP 2.0.1J (IEC 63584); OCPP 2.1 V2X extensions on roadmap
Certifications (shared product-family baseline) CE 3N240131.SHN0W49, TUV CB R 50695913 0001, UKCA CN25G3TM 001, Australia RCM RCMC26013005D, ETL 2408B2314SHA-001, ENERGY STAR C2506171 (configurable per order)
Target buyer Fleet integrators, utility DER programmes, depot operators, regional distributors in developed markets

Buyers running pilot-scale deployments typically start with 2–4 units of 30 or 60 kW, pair them with an aggregator contract, and expand to full depot coverage after the first revenue cycle.

9. Six RFQ clauses to put in your V2G tender

  1. Bidirectional protocol: "Charger shall support ISO 15118-20:2022 bidirectional power transfer over CCS2. CHAdeMO bidirectional (BiDi) shall be a configurable option. Supplier shall declare current firmware version and ISO 15118-20 certification body."
  2. OCPP V2X: "Charger shall implement OCPP 2.0.1J (IEC 63584) at minimum, with a documented upgrade path to OCPP 2.1 V2X extensions for aggregator dispatch, discharge-depth capping and bidirectional energy settlement."
  3. Grid interconnection: "Charger shall hold a valid Type Tested approval for the destination grid code (G99 for UK, UL 1741 SB + IEEE 1547-2018 for US, VDE-AR-N 4105 or 4110 for Germany). Approval reference numbers to be supplied with the bid."
  4. Round-trip efficiency: "Supplier shall declare round-trip efficiency (grid → battery → grid) at 25% and 100% nameplate power, measured per IEC 61851-23:2023 or equivalent, with test report attached."
  5. Cybersecurity: "Charger shall support mutual TLS 1.3 authentication per ISO 15118-20, X.509 certificate rotation under Hubject V2G Root CA or equivalent PKI, and secure OTA firmware update signed by the OEM."
  6. Warranty and cycle life: "Supplier shall warrant the bidirectional power module for a minimum of 5 years or 10,000 full bidirectional cycles, whichever occurs first, and shall declare mean time between failures (MTBF) for the power stack."

10. Pilot evidence: LA AFB, NYC schools, UK depots

Three pilots anchor the business case in 2026 procurement conversations. Los Angeles Air Force Base ran a 40-vehicle non-tactical fleet trial with roughly half the vehicles configured for V2G, demonstrating frequency regulation revenue in the CAISO market. New York City deployed school-bus V2G at multiple districts, with Efficiency Maine and NYSERDA publishing per-bus revenue figures above USD 10,000 per summer. UK fleet guides (Octopus Electroverse, Cenex) document residential and small-fleet V2G revenue in the Octopus Flux and Intelligent Octopus tariffs, pointing to GBP 400–900 per vehicle per year in bill savings for V2H and higher figures where the aggregator captures FFR revenue.

11. Deployment risks and mitigations

Risk Mitigation
OEM warranty voids on bidirectional cycling Confirm OEM V2G warranty policy before order (Nissan Leaf, Kia EV9, Hyundai Ioniq 5 have published positions). Cap discharge depth in OCPP 2.1 V2X profile.
Interconnection delay (G99, Rule 21) Submit DNO / utility application before placing hardware order. Allow 4–12 weeks depending on jurisdiction.
Aggregator counterparty risk Prefer aggregators with multi-year track record and transparent revenue reporting (Octopus Energy, Fermata Energy, Nuvve, The Mobility House).
Protocol fragmentation (CCS vs CHAdeMO) Specify both protocols as configurable options in the RFQ. Audit fleet composition before locking the connector mix.
Site power upgrade Budget USD 8,000–10,000 for a five-EV depot upgrade; higher for >10 ports or urban substation constraints.

12. FAQ

Q1. What is V2G?

V2G (vehicle-to-grid) is a bidirectional charging mode where an EV discharges energy back into the utility grid through a bidirectional DC charger, under utility interconnection approval and typically through an aggregator contract that monetises frequency regulation, peak shaving or demand response.

Q2. What is the difference between V2G, V2H and V2L?

V2L powers appliances directly from the car at 1.5–3.6 kW; V2H powers a home panel through a bidirectional wallbox at 7.4–11 kW; V2G exports energy to the utility grid at 11–240 kW and generates grid revenue. Fleet depots almost always want V2G.

Q3. How much does a V2G charger cost?

A 50 kW CCS bidirectional DC charger costs USD 5,000–15,000, roughly 1.5–2× a comparable unidirectional unit. UK installed cost for a residential-grade V2G charger is GBP 4,000–7,000. Utility service upgrades for a five-EV depot typically add USD 8,000–10,000.

Q4. Which cars support V2G?

Nissan Leaf and Mitsubishi Outlander PHEV support CHAdeMO bidirectional natively. Kia EV9, Hyundai Ioniq 5 and Ioniq 6 (model-year dependent), Volvo EX90 and Ford F-150 Lightning (V2H) support ISO 15118-20 or vendor bidirectional profiles. Confirm per vehicle VIN before specifying the RFQ.

Q5. Is V2G worth it financially for fleets?

Verified pilots report USD 1,000–5,000 gross revenue per vehicle per year for light-duty fleets, rising above USD 10,000 for school buses with long summer idle. Payback is typically 3–5 years for depot fleets and 12–24 months for school-bus V2G.

Q6. What is a G99 certificate?

G99 is the UK Engineering Recommendation that governs grid connection of generation sources above 16 A per phase. V2G chargers above 3.68 kW typically require G99 Type Tested approval from the local DNO; smaller units fall under G98.

Q7. Does ISO 15118-20 require Plug & Charge for V2G?

ISO 15118-20 supports Plug & Charge contract-based authorisation and bidirectional energy transactions in the same session, but the two features can be deployed independently. V2G can run with EIM (External Identification Means) authorisation; PnC becomes relevant when the aggregator settles bidirectional energy against a mobility contract.

Q8. CHAdeMO or ISO 15118-20 for a mixed fleet?

Specify both as configurable options in the RFQ. Order CHAdeMO BiDi for depots with Nissan Leaf or Japanese-market vehicles; order ISO 15118-20 for depots standardising on CCS2. The Numbat charger supports both in a single cabinet; the HG Power V2G Bidirectional Series offers CCS2 and CHAdeMO as configurable connector options.

Q9. How long does V2G interconnection approval take?

Typical timelines in 2026: UK G99 Type Tested 4–8 weeks, California Rule 21 6–12 weeks, Germany VDE-AR-N 4105 2–6 weeks for notifiable installations and 8–16 weeks for 4110 medium-voltage. Submit the application before placing the hardware order.

13. References

Block A — standards and regulation

  • ISO 15118-20:2022, Road vehicles — Vehicle to grid communication interface — Part 20: 2nd-generation network layer and application layer requirements.
  • IEC 63584:2024 (OCPP 2.0.1 as international standard).
  • CHAdeMO Association, Bidirectional charging protocol specification.
  • Engineering Recommendation G99, Issue 1 Amendment 10, 2024 (UK Energy Networks Association).
  • CPUC Rule 21, UL 1741 SB, IEEE 1547-2018.
  • VDE-AR-N 4105:2018-11 and VDE-AR-N 4110.
  • Regulation (EU) 2023/1804 (AFIR).

Block B — pilots and economics

  • Los Angeles Air Force Base V2G demonstration (DoD / CAISO).
  • NYSERDA and Efficiency Maine school-bus V2G reports.
  • Octopus Energy, Cenex, Nuvve, Fermata Energy, The Mobility House public case studies.
  • Wallbox Quasar, Zaptec Pro V2G, Numbat and Watt&Well product documentation.
Procuring V2G hardware for a fleet or utility programme?
The HG Power V2G Bidirectional Series spans 15–240 kW with CCS2 and CHAdeMO as configurable connector options and an ISO 15118-20 roadmap. Request a V2G procurement consultation →

Reviewed by HG Power product engineering (V2G Bidirectional Series). Author: Marvin Zhou, Head of International Marketing, HG Power (Shenzhen Hongjiali New Energy Co., Ltd.). Last updated: 2026-10-30.